    Maroon Flare Gas Recovery Project

    Client:
    The National Company of Southern Oil-bearing Regions

    type of project :
    Investment (design, implementation, exploitation)

    project location :
    Khuzestan, Ahvaz

    This project is implemented as an investment in 4 phases, and the goal of the project in the first phase is to build a sweetening and sulfur removal facility based on catalytic processes, in order to provide the sweetening absorbent used in this project on time, increase efficiency and prevent The withdrawal of foreign currency from the country, the acquisition of technical knowledge and technology for the construction and construction of the sweetening absorber were realized and its production was localized in the first phase of the factory.

    In the first phase of the project, two sweetening towers have been installed.

    The second phase of the project is considered with the pressure boosting compressor.

    The third phase of the sour gas collection project is the second and third stages of Bangestan Maron 3 by pressure boosting compressor.

    The fourth phase is the gas collection of the second stage of Shirin Asmari Maron 3 by the pressure boosting compressor that has replaced the Mansouri project.