This project will be implemented in the vicinity of Sarostan Saadat Abad operation unit, located 80 km southeast of Shiraz city. This project is used for the extraction of gas with oil, which is separated in the surface facilities of the Sarvostan oil field and is flared under normal conditions. This project includes the daily refining of about 14 MMSCFD, taking into account ten percent, over design, and with an efficiency of 85 percent for the extraction of gases from the flare stream and the condensate separated from the inlet stream as LPG by-products, C3, C4 and C5+ (To produce 2.95 tons per hour of LPG and produce 0.67 tons per hour of C5+ product, which is known as NGL). This project includes all process equipment along with related utilities and 9 kilometers of underground gas transmission line to the national network.